673 results:
321. TU Dortmund  
Technical Data Boiler type: 2 x double flame tube boilers for hot water generation Burner type: 4 x TEMINOX G Duoblock Burner capacity (max.): 4 x 6,25 MW Fuel: Natural Gas Control range: 1:7…  
322. TU Dortmund  
The SAACKE solution in detail In the course of the modernization, the air supply including measurement and control technology was also renewed. Thanks to the frequency-controlled blowers and heat…  
323. TU Dortmund  
Two double-flame tube boilers, each with an output of 12.5 MW, supply around 100 buildings at Dortmund Technical University with hot water. Due to the age of the system and stricter legal…  
324. TU Dortmund  
04 Conclusion  
325. TU Dortmund  
03 Benefits  
326. TU Dortmund  
02 Solution  
327. TU Dortmund  
01 Task  
328. Warsteiner Brewery  
Professional engineering and profound know-how in thermal system solutions – thatʼs what SAACKE stands for. Therefore our long-standing customers trust us. With our TEMINOX combustionsystems, the…  
329. Warsteiner Brewery  
Ultra-Low NOx technology for low emissions far below national and international emission standards Uncomplicated installation, commissioning and maintenancereduce downtimes, therefore particularly…  
330. Warsteiner Brewery  
The SAACKE solution in detail The commissioning was carried out by SAACKE together with the boiler manufacturer and the plant manufacturer in autumn 2020 and took about one week. The installations…  
Search results 321 until 330 of 673