673 results:
281. Bergesen Worldwide Offshore  
04 Conclusion  
282. Bergesen Worldwide Offshore  
Global project management from a single source Reliable compliance with the respective NOX limit Highly efficient firing technology for drive and crude oil treatment Use of different fuels…  
283. Bergesen Worldwide Offshore  
03 Benefits  
284. Bergesen Worldwide Offshore  
The SAACKE solution in detail Specifically, SAACKE modernized the boiler system for the ship's existing propulsion system to make it ready for a two-month crossing from the Chinese shipyard to Rio…  
285. Bergesen Worldwide Offshore  
Technical Data Boiler type: 2 Foster Wheeler „Monowall“ ESD III Burner type: 3 x DDZG 10 per boiler Burner capacity: Je 3 x 22,7 MW per boiler Fuel: MDO, crude oil, fuel gas Steam super-heater…  
286. Bergesen Worldwide Offshore  
New piping of two boilers of the existing propulsion plant as well as three dual-fuel DDZG burners including new fittings, controls and steam system instruments. 350 million barrels of oil are to…  
287. Bergesen Worldwide Offshore  
02 Solution  
288. Bergesen Worldwide Offshore  
As part of the conversion of the supertanker BW Nisa into a floating production storage and offloading unit (FPSO), an energy-efficient and low-emission plant system was required. In addition to…  
289. Bergesen Worldwide Offshore  
01 Task  
290. Bergesen Worldwide Offshore  
Conversion of supertanker NISA to FPSO unit P63. SAACKE Marine Systems supplies complete plant system and global project management for customers Bergesen Worldwide Off shore  
Search results 281 until 290 of 673