673 results:
261. ElectroGas Malta  
03 Benefits  
262. ElectroGas Malta  
The SAACKE solution in detail In addition to the two low NOX boilers with superheaters and flue gas recirculation, the scope of services included four vapor coolers, a feedwater pump assembly and…  
263. ElectroGas Malta  
Technical Data Unit capacity: 20t/h at 20 bar and 260°C Steam cooling:  10 t/h and 18 t/h Burner capacity: 16,4 MW fuel gas, 16,2 MW MDO / MGO Low‐NOX emissions: 100 mg/m3 im gas operation,…  
264. ElectroGas Malta  
SAACKE FMB-VD boiler including DDZ-G burner and other  customized components from a single source, jointly implemented by several international company locations within nine months. Up until…  
265. ElectroGas Malta  
02 Solution  
266. ElectroGas Malta  
To ensure efficient, low-emission power generation in the shortest possible project time, ElectroGas Malta Ltd had an existing LNG tanker structure converted into a floating storage unit (FSU). The…  
267. ElectroGas Malta  
01 Task  
268. ElectroGas Malta  
Low-emission power generation in Malta.  SAACKE equips Floating Storage Unit (FSU) with low NOX dual-fuel system  
269. Hudong-Zhonghua Shipbuilding  
One thing is clear: LNG transports will increase significantly in the coming years. This makes the safe and environmentally friendly burning of boil-off gases at sea all the more important. SAACKE…  
270. Hudong-Zhonghua Shipbuilding  
04 Conclusion  
Search results 261 until 270 of 673